Stream Ocean
Brand & website
Building an identity from the name outward
- Role
- Founding Designer
- Year
- 2022 · 2026

The problem
Stream Ocean had the technology and no identity. There was no name, no mark and nothing to launch with. The brand had to read as immediate and technical without losing the reason any of it exists, the biodiversity it measures.
What I did
I joined as founding designer in 2022 and built the brand from the name outward. The mark is a square window onto water, drawn on a grid derived from circle geometry. The frame the model draws around a fish is the same window at another scale, so it runs through the posts and the site. Living Coral carries the palette, for the reefs the cameras watch. In 2026 I redesigned the website as a concept, built in code but never deployed. It gives the camera, the detection and the Sentinel dashboard equal weight, and sets Archivo and DM Mono beside Stream Sans.
Outcome
The identity and the launch site shipped in 2022. The 2026 site stays a concept, recorded below from top to bottom. Its sector photographs are generated and its two testimonials are placeholders. The billboard, the posters and the camera photograph are generated too.










